The following table details the resource assignment information that is mapped from Microsoft Project to fields in CA Clarity PPM.
Any assignment that exists in CA Clarity PPM when a timesheet for that resource is posted gets an Actuals Thru date equal to the end of the timesheet period. Conditions can exist where you inadvertently place remaining work before this date. The following examples illustrate this condition:
When these situations occur, the work is moved beyond the Actuals Thru date when you save the project to CA Clarity PPM. A message appears warning you of the change.
Microsoft Project |
CA Clarity PPM |
Notes |
---|---|---|
Units |
Max % Load PRAssignment: PRESTMAX |
When opening the project in Microsoft Project, this field is set to the value in CA Clarity PPM multiplied by the resource maximum units (or by 1 if the maximum unit is 0). This value is set only for the not contoured assignment of labor resources to unfixed tasks. When saving the project to CA Clarity PPM, this field is set to the assignment units divided by the resource maximum units. Or if either value is 0, sets the value to 1. This value is set only for assignments of labor resources. |
Number1 |
Task Assignment: Proposed ETC (Not displayed by default) PRAssignment: PRPENDESTSUM |
When opening the project in Microsoft Project, this field is set to the value in the field or to -1 when the Pending Estimates in CA Clarity PPM is blank. This field is saved to CA Clarity PPM only if:
|
Number2
|
Pending Actuals (not displayed by default) PRAssignment: PRPENDACTSUM |
This field is not saved back to CA Clarity PPM. |
Task Properties: Status PRAssignment: PRSTATUS |
This field is set to the following:
|
|
Resume |
Actuals Thru Date PRAssignment: PRactThru |
This field must always be on or after the last day of the actuals on the assignment. If either the project or the assigned resource has Track Mode set to None, the following applies:
|
Actual Work |
Actuals PRJ_BASELINE_ DETAILS: PREXTENSION |
This information is saved to CA Clarity PPM only if the Track Mode is set to None for either the project or the assigned resource. |
Work |
Assignment Properties: Assignments: ETC PRASSIGNMENT: PREXTENSION |
This field is set when saving to CA Clarity PPM only if the assigned resource has Track Mode set to None. |
Baseline Start |
Assignment Properties: Baseline: Baseline Start Date (not displayed by default) PRJ_BASELINE_ DETAILS: START_DATE |
|
Baseline Finish |
Assignment Properties: Baseline: Baseline Finish (not displayed by default) PRJ_BASELINE_ DETAILS: FINISH_DATE |
|
Baseline Cost |
Assignment Properties: Baseline: Baseline Cost (not displayed by default) PRJ_BASELINE_ DETAILS: COSTSUM |
|
Baseline Work |
Assignment Properties: Baseline: Baseline Usage (not displayed by default) PRJ_BASELINE_ DETAILS: USAGESUM |
You must have Modify Baseline rights to save a baseline to CA Clarity PPM. |