Previous Topic: Job Summary - Actual Report WLP07Next Topic: Detailed Resource Utilization - Actual Report WLP07


Detailed Resource Utilization - Projection Report WLP07

The Detailed Resource Utilization - Projection report provides job flow information from a simulation run. Statistics on the report for all jobs that, based on this simulation, would have run during a specific time period include the following:

A plot graphically shows when each job ran within a specified span of eight hours. The report is useful in studying the flow of jobs and the job mix, or how jobs interact with each other. A status field indicates when jobs are late, suggesting that a job schedule problem exists.

The WLP data statement file, extracted from the database by the FWLP command or created manually, is the input for this report. The WLP1 control statement must also appear in the WLPCC control record file to generate the report.

WLP07 - 01/12/yy.012 10:28:03 PAGE 0001 ** C A - 7 W O R K L O A D P L A N N I N G ** ** D E T A I L E D R E S O U R C E U T I L I Z A T I O N -- P R O J E C T I O N ** -- TIME PERIOD : FROM yy.011/09:00 TO yy.011/17:00 JOB NAME SCHDID DOTM START TM ELAP CPU T1 T2 C PRT RR RI 0 1 1 1 1 1 1 1 1 STATUS DDD/HHMM DDD/HHMM HHMM MMMSS 9.....0.....1.....2.....3.....4.....5.....6.....7 CC HHMM ACLWAIT1 030 011/1715 011/1300 0004 00004 0 0 A 100 0 - +0411 JFM001 030 011/1715 011/1300 0004 00001 0 0 U 100 1 - +0411 JFM770 030 011/1735 011/1300 0005 00007 0 0 U 100 2 - +0430 JFM014 030 011/1738 011/1304 0013 00009 1 0 U 100 1 - +0421 AFM135 030 011/1742 011/1304 0017 00024 2 0 B 100 3 -- +0421 JFM013 030 011/1744 011/1304 0019 00016 1 0 U 100 2 -- +0421 JFM012 030 011/1757 011/1304 0032 00019 1 0 U 100 2 --- +0421 JFM011 030 011/1820 011/1317 0035 00036 1 0 U 100 2 ---- +0428 JFM010 030 011/1834 011/1317 0049 00035 1 0 U 100 3 ----- +0428 JFM112 030 011/1942 011/1317 0157 00423 1 0 U 100 4 ------------ +0428 JFM062 030 011/1811 011/1352 0004 00005 0 0 I 100 0 - +0415 JFM002 030 011/1825 011/1356 0004 00002 0 0 U 100 1 - +0425 JFM040 030 011/1848 011/1514 0004 00002 0 0 U 100 0 - +0330 BFM135 030 011/1940 011/1518 0215 00727 2 0 B 100 13 ---------- +0207 INITIATOR USAGE (HRS) 0.0 0.0 0.0 0.0 3.7 1.1 1.0 1.0 TP1 USAGE (HRS) 0.0 0.0 0.0 0.0 3.7 1.1 1.6 2.0 TP2 USAGE (HRS) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CPU TIME (MINS) 0.0 0.0 0.0 0.0 4.2 2.3 2.9 3.3

This report contains the following fields:

TIME PERIOD FROM

Indicates the beginning date and time of the simulation.

TIME PERIOD TO

Indicates the ending date and time of the simulation up to eight hours past the FROM period. Simulations longer than this span are divided into eight hour time spans for reporting purposes. All jobs that ran during an eight hour span are listed before the report continues with the next eight-hour span.

JOB NAME

Indicates the job name.

SCHDID

Indicates the schedule ID of the job.

DOTM

Indicates the due-out day and time of the job.

START TM

Indicates the start day and time of the job.

ELAP

For executable jobs, indicates the elapsed time of the job. The nonexecutable jobs show ***NON-EXEC.

CPU

Indicates the CPU time of the job.

T1

Indicates the number of TYPE1 tape drives required by the job.

T2

Indicates the number of TYPE2 tape drives required by the job.

C

Indicates the WLB class of the job.

PRT

Indicates the workload balancing (WLB) priority of the job.

RR

Indicates the rerun rate that is expressed as a percentage of the job.

RI

Indicates a rerun job. A value of R indicates a job's elapsed time and CPU time are extended to represent rerun spoilage as indicated by the RERUN, RRTHRSH, and RRSPOIL values on the WLP1 control statement. (Rerun time is included in elapsed time only for the Projection report.)

09...17

Indicates an eight hour span against which elapsed time is plotted. The first eight-hour span that is reported begins on the one hour boundary before the simulation FROM time appearing on the earliest RES statement time. An individual job's span begins at its start time. A value of C appears in the first column of this field when the elapsed timespan of the job has been continued from a previous time range.

CC

Indicates the completion code of the job (actuals only).

STATUS

Indicates the status of the job that is based on due-out time. End time is either earlier (+) or later (-) than due-out time. Asterisks (**) appear when a job is late.

INITIATOR USAGE (HRS)

Indicates total initiator hours that are used per hour for each of the eight hours for this simulation.

TP1 USAGE (HRS)

Indicates total TYPE1 tape drive hours that are used per hour for each of the eight hours for this simulation.

TP2 USAGE (HRS)

Indicates total TYPE2 tape drive hours that are used per hour for each of the eight hours for this simulation.

CPU TIME (MINS)

Indicates the total CPU minutes used per hour for each of the eight hours for this simulation.