Job Summary - Actual Report WLP07

The Job Summary - Actual report provides actual job status summary information based on deviations from due-out times. The information is taken directly from the CA WA CA 7 Edition log history file for a specified timespan. The WLP2 control statement must also appear in the WLPCC control record file to generate this report.

WLP07 - 01/12/yy.012 10:28:03 PAGE 0001 **             C A - 7   W O R K L O A D   P L A N N I N G   ** ** J O B S U M M A R Y -- A C T U A L ** -- TIME PERIOD : FROM yy.011/09:00 TO yy.011/20:19 AVERAGE MAXIMUM COUNT DEVIATION DEVIATION JOBS SCHEDULED 82 + 02:58 JOBS EARLY 50 + 01:19 + 06:22 JOBS LATE 32 - 09:40 - 19:43

This report contains the following fields:

TIME PERIOD FROM

Indicates the beginning date and time for this actuals run.

TIME PERIOD TO

Indicates the ending date and time for this actuals run.

COUNT

Indicates total number of jobs for this actuals run as follows:

AVERAGE DEVIATION

Indicates average job completion time deviations for this actuals run as follows:

MAXIMUM DEVIATION

Indicates the highest completion time deviation for this actuals run, as follows: