RM.2 - Job/Resource Cross-Reference List Panel

The RM.2 Job/Resource Cross-Reference List panel lets you list jobs using resources. You can list the jobs by a fully qualified resource name or by a generic key.

To display the panel, enter:

To exit the panel:

------------------- CA-7 JOB / RESOURCE CROSS REFERENCE LIST ------------------ FUNCTION ====> (FORMAT,LIST) RSRC: LIST-SCHID: PAGE 0001 RESOURCE NAME SCHID JOBNAME STEPNAME TYPE FREE PROGRAM: RSC2 MSG-INDX: 00 -- RM.2 -- yy.ddd / hh:mm:ss MESSAGE: ENTER FUNCTION, TRANSFER OR ENTER A COMMAND ON THE TOP LINE

This panel contains the following fields:

FUNCTION

Specifies the function to perform. Value must be the name of some other panel or one of the following:

FORMAT

Clears the panel of user input data.

LIST

Lists the resources and the associated jobs that are based on user specified resource criteria.

Batch keyword: Positional parameter

RSRC

Specifies the resources for which information is listed.

*

Specifies all resources.

resource

Specifies a fully qualified resource name.

Limits: 1 to 44 alphanumeric characters

resource*

Specifies multiple resources specified by a generic resource name.

Limits: 1 to 43 alphanumeric characters terminated with an asterisk

Batch keyword: RSRC

LIST-SCHID

(Optional) Applies only to the LIST function. A SCHID value of 0 applies to connections for all schedules and therefore is listed with connections for any schedule ID requested. Schedule IDs on each detail line apply to that line only.

Default: Null (causes connections for all schedule IDs to appear)

Limits: 1 to 3 numeric characters from 0 through 999

Batch keyword: SCHID

RESOURCE NAME

Identifies the requested resources.

SCHID

Identifies the schedule ID of the job using this resource.

JOBNAME

Identifies the name of the job using this resource.

STEPNAME

Identifies the name of the step that frees this resource.

TYPE

Identifies the usage mode of the resource (for example, SHR, EXC).

FREE

Identifies the disposition of this resource at step, abnormal, or successful completion time.

Note: For more information about the FREE keyword, see the RM.1 panel descriptions.