Schedule Modifications

Schedule Modifications apply to both jobs and input networks and can only be made to an already defined and resolved schedule. Such modifications are handy when a request is made to run a scheduled job or input network on a date, time, or both that deviates from the existing schedule.

One way to make such changes to an existing schedule is to use the Schedule Modification DB.2.7 panel. This panel displays a SCHID in calendar format showing when the job or network does or does not run. The schedule can be temporarily modified until the next DB.2.7 panel or RESOLV command is used against it.

Another way to permanently alter a schedule is by using the DB.2 panel to change it and then issuing a RESOLV command.