Reason:
The schedule day indicated by month (mmm) and day (dd, nnn) falls on a base calendar nonprocessing day and has been rolled, forward or backward, to the base calendar processing day indicated by month (xxx) and day (yy, zzz). If the day that is rolled from or to is outside of the year's span that is resolved, the nnn or zzz value is zero. The ROLL option in the database schedule entry specified that scheduling should be rolled backward (ROLL=B) or forward (ROLL=F) to the next base calendar processing day.
Action:
Verify that each rolled schedule day should be rolled. If not, the schedule member must be changed and resolved again.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|