Reason:
The schedule day indicated by month (mmm) and day (dd, nnn) falls on a base calendar nonschedule (nonprocessing) day. The ROLL option defined in the database schedule entry specified that scheduling should occur on base calendar nonprocessing days (that is, do not reschedule forward or backward).
Action:
Verify each of these days to ensure that scheduling on base calendar nonprocessing days will produce the results you want. If schedule days are to stand as shown, no action is required. If scheduling is to be bypassed or rolled (forward or backward), the schedule member must be changed and resolved again.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|