Previous Topic: Planning Migration and UpgradesNext Topic: How to Plan a Migration


Upgrade Paths

An upgrade consists of deploying 12.51 components to an existing CA SiteMinder® environment. Upgrading to 12.51 can be accomplished in two ways:

Migration

A migration is the process of upgrading individual CA SOA Security Manager components until your environment is operating at CA SiteMinder WSS 12.51. Upgrading individual components consists of one or more steps during which you:

You upgrade individual components over an extended period to maintain system availability. A key to maintaining system availability is the order in which you upgrade components. During a migration, specific components that have been upgraded can continue to communicate with prior versions. This type of communication is known as mixed-mode support.

The following illustrates the concept of a migration:

12.51 migration stages 1 thru 3

Parallel Upgrade

A parallel upgrade is the process of configuring a CA SiteMinder WSS 12.51 environment beside an existing r12.1 SP3 environment. Configuring a parallel upgrade consists of multiple steps during which you:

The following illustrates the concept of a parallel upgrade.

Diagram showing how a parallel upgrade works