Operators in a schedule are started according to specified calendar and time conditions. Properties groups for any operator added to a schedule associate calendar rules and other time conditions with the operator. Click the Properties icon in the schedule editor to view operator properties. General scheduling properties display on the General tab. Operator-specific properties display on the Specific tab.
Specify the time to start the operator in the first drop-down menu in the Start Time drop-down list. Specify repeating intervals through the Repeat Interval (minutes) check box. Select this check box to execute the operator at fixed intervals. Select a time to stop repeating the operator in the End Time drop-down.
Note: See the Content Designer Guide for more information about schedules.
|
Copyright © 2014 CA.
All rights reserved.
|
|