The ROI tab contains the following fields:
Enables the ROI fields.
Values: This check box has one of the following values:
Default: Cleared
Specifies the cumulative number of staff hours and minutes it takes to trigger manually multiple operations within the process. As an example, you have a process that contains three steps, one of which backs up files into a folder that you must first create. The time that you spend creating, placing, and naming the folder is added to the overall manual labor time. This value does not include the time that it takes to back up the files.
Specifies the cumulative number of staff hours and minutes it takes to execute the entire process manually, start-to-finish. Using the previous example, this sum includes the following time frames:
Specifies the criticality for this process.
Values: High, Medium, or Low.
Note: The ROI report displays the criticality of the process.
Optionally, as you build processes, tag each process through this field with a common group name under which they are sorted in the ROI Report.
Note: You can group processes by group name in the ROI report. Click the Reports tab and run the Return on Investment Report for an application or system group.
|
Copyright © 2014 CA.
All rights reserved.
|
|