

Designing Processes › Process Lanes › Lane Handling Rules
Lane Handling Rules
When a process contains multiple lanes, you can define lane change rules. These rules specify operator sequences that are invoked only when running a process crosses a lane boundary. Each rule is defined to occur for one of the following lane transitions:
- From a specific lane to another specific lane (from lane A to lane B)
- From a specific lane to any other lane (lane A to any)
- From any lane to a specific lane (any to lane B)
- From any lane to any other lane (any to any)
Lane change rules look like any operator sequence on the Main Editor tab, except each rule starts with a Lane Change operator instead of a Start operator. Lane Change operator properties define the transition between source and destination lanes that invoke the operator sequence that is linked to the Lane Change operator.
Follow these steps:
- At the bottom of the Process Designer, select the Lane Change Handler tab.
- From the Operators palette Standard group, drag a Change Lane operator to the Lane Change Handler panel.
- Double-click the Change Lane icon, and click the Properties pane Change Lane properties panel.
- In the Name field, type a name to identify the rule.
- For Source and Destination, select the combination of lanes that triggers the rule.
- Click Apply.
- From the palette, drag more operators to the process that completes the rule for the transition, and configure each one as necessary.
- In the toolbar, click the Save button.
The new transition rule is complete.
Copyright © 2013 CA.
All rights reserved.
 
|
|