Panel Field Descriptions

Action

Display only. Your selected action displays.

Current status

Display only. The current status of the Move Request displays.

Move Req

Display only. Your Move Request number displays.

Description

Display only. The description of the Move Request displays.

Number of modules

Display only. The total number of entities included in this Move Request displays.

App/Ver for LEVL
App Req

Display only. This field contains one column for each Approval category. A Y displays in each category that is required for the upcoming move. Blanks display in categories that are not required.

This field does not display for Move Requests that are in Being Created status.

App So Far

Display only. This field contains one column for each Approval category. A Y displays in each category that has already been granted for the upcoming move. A D displays for each category that has been explicitly disapproved. Blanks display in all categories that are not required or have not yet been addressed. This field does not display for Move Requests that are in Being Created status.

Ver Req

Display only. This field contains one column for each Verification category to close the Move Request. A Y displays in each category that is required for the upcoming move, or a Y displays if the Move Request is in Being Created status. Blanks display in categories that are not required.

Ver So Far

Display only. This field contains one column for each Verification category. A Y displays in each category that has already been successfully obtained. A U displays for each category that was unsuccessful. An S displays for each category that started but has not yet finished. Blanks display in all categories that are not required or have not yet been addressed.

Final Move date

Required. Format: system date.

This date shows the Final Move Date for this Move Request. This is the date for the move to the final level for the Move Request.

Update by typing over the date in this field. CA-PanAPT does not accept a date prior to the current date.

While the year is displayed as four digits, you need only enter two digits. CA-PanAPT converts the two-digit year into four digits, including the century.

To enter today's date, enter an equal sign (=) in the first position of the date.

Next Move date

Optional. Format: system date.

This date shows the Next Move Date for this Move Request. This is the date of the move to the next level for the Move Request. If the Move Request has been closed, and the next level is the final level, this field not appear on the panel; the Final Move date is used to schedule moves to the final level.

Update by typing over the date in this field. CA-PanAPT does not accept a date prior to the current date or later than the Final Move date. If this field is blanked out, the next move is not restricted by a date.

While the year is displayed as four digits, you need only enter two digits. CA-PanAPT converts the two-digit year into four digits, including the century. To enter today's date, enter an equal sign (=) in the first position of the date.

First run date

Optional. Format: system date.

This date shows the First Run Date for this Move Request. This field is provided for documentation purposes. It is intended to be the date these modules are first run in production.

Update by typing over the date in this field. CA-PanAPT does not accept a date prior to the Final Move date.

While the year is displayed as four digits, you need only enter two digits. CA-PanAPT converts the two-digit year into four digits, including the century. To copy the Final Move date to the First Run date, enter an equal sign (=) in the first position of the date.