Previous Topic: User Preparation and PlanningNext Topic: Performing Phase Two  Using CA PanAPT


Preparation Steps

Use the following steps to prepare for Phase Two implementation:

  1. User IDs:

    Determine user roles in CA‑PanAPT implementation.

  2. Library Code:

    Fill out the pages of the Library Code Set‑up Form for your Phase Two Library Code.

  3. Set up model:

    Copy and change the sample provided if necessary, review the Modeling Facility chapter later in this guide.

    Review your selected/changed model to be sure you understand its functionality.

  4. Set up a Retrieve model if your Library Code has Retrieve enabled.
  5. Determine any changes required to CA‑PanAPT Batch:

    If necessary, see the "Setups for Different Types of Moves" chapter in the CA‑PanAPT Reference Guide. Make appropriate changes to PROCLIB or PARMLIB as described.