Previous Topic: DescriptionNext Topic: Preparation Steps


User Preparation and Planning

Use the following steps to prepare and plan:

  1. Select the set of libraries to be controlled. Designate which is to be a TEST, QA, PROD, PROD Backup, or PROD Backout library.
  2. Determine the names of members to be used for the initial Move Request.
  3. Review the Modeling Facility later in this guide.