Specifies how long CA PMO waits between detecting a LNKLST update and refreshing LLA.
Even if this parameter has a value of zero (0), a refresh will not occur instantly. CA PMO checks the need for a refresh only every ten seconds, and the LLA takes time to process the command and update its storage areas. You may want to specify REFDELAY=00:00:00 so that refreshes occur as soon as possible. A delay, however, may be desirable. For instance, if you update several libraries in a row, you may want to finish the updates before the refresh occurs (particularly if you update programs that call each other).
The REFDELAY parameter has the following syntax:
REFDELAY=LLA refresh delay
The REFDELAY parameter requires the following value:
Indicates the time in hours, minutes, and seconds that CA PMO or PMO/XSYS waits before refreshing the LLA. Specify a value between 00:00:00 and 24:00:00. This parameter is valid only when LLA=AUTO and OPERMSG=NO.
Default: REFDELAY=00:05:00
Note: If a second LNKLST update occurs more than 15 seconds into the refresh delay period, CA PMO postpones the refresh and restarts the delay period.
|
Copyright © 2011 CA.
All rights reserved.
|
|