This step gives a period the same links to resources as another period.
To define the same links
The Period Maintenance Panel displays.
The period you are defining will have the same links to resources as the period whose name you enter in this step.
The Schedule Manager deletes all existing links for this period, duplicates the links of the period whose name you specified, and returns you to the Links Control panel.
Copyright © 2014 CA.
All rights reserved.
|
|