Previous Topic: Synchronize a ScheduleNext Topic: View Schedule Overlaps


Merge Schedules

The two ways to merge a schedule are from the following panels:

From the Primary Panel

  1. Type the name of the schedule to combine with another schedule in the NAME field.
  2. Type the name of an existing schedule in the NEWNAME field.
  3. Type M on the command line and press Enter.
  4. Press Enter again to confirm that you want to merge the schedules.

From the Schedule List Panel

  1. Type an M in the SEL column next to the name of the first schedule you want to merge.
  2. In the New Schedule field, type the name of the second schedule you want to merge.
  3. Press Enter, and then Enter again to confirm that you want to merge the schedules.

Result-The Schedule Manager merges the data from the two schedules into a schedule specified in the NEWNAME/New Schedule field.

If the names of the two schedules to be merged conflict, then Schedule Manager uses the name of the first schedule (the one listed in the NAME field). If the same period or link name appears in both schedules, then the data from the period specified in the NAME field overlays that of the period specified in the NEWNAME field.