The two ways to merge a schedule are from the following panels:
From the Primary Panel
From the Schedule List Panel
Result-The Schedule Manager merges the data from the two schedules into a schedule specified in the NEWNAME/New Schedule field.
If the names of the two schedules to be merged conflict, then Schedule Manager uses the name of the first schedule (the one listed in the NAME field). If the same period or link name appears in both schedules, then the data from the period specified in the NAME field overlays that of the period specified in the NEWNAME field.