Synchronize a Schedule

The two ways to synchronize a schedule are from the following panels:

From the Primary Panel

  1. Type the name of the schedule you want to synchronize in the NAME field.
  2. Type Y on the command line and press Enter.

From the Schedule List Panel

  1. Type a Y in the SEL column next to the name of the schedule you want to synchronize.
  2. Press Enter to synchronize the schedule.

Result-The Schedule Manager finds all links that point to periods that no longer exist or to resources that are no longer managed by System State Manager. Primarily, these invalid links are caused by removing a resource from System State Manager control without first removing it from Schedule Manager control; however, they can also be caused by system failures while a schedule is being edited. When an invalid link is found, the following menu of choices appears:

Schedule Manager ----------- SYNCH Selection List ---------- SELECT ONE ACTION Command ===> Scroll ===> PAGE Select one of the following actions for invalid TABLE: SSMTEST _ change all the links containing this item to use a new item name selected from the list of valid names shown below, _ leave all the links containing this item as is, _ delete all links containing this item, _ stop showing this panel and leave as is all future links that contain an item that has not already had an action (change name/leave as is/delete) assigned, _ stop showing this panel and delete all future links that contain an item that has not already had an action (change name/leave as is/delete) assigned. Sel TABLE ___ SWZ_STCTBL

You must select one and only one action by typing an S next to the action and pressing the Enter key.