BREAK SHIFT, DATE, DAY(SK), IF WEEKDAY EQ SUNDAY, DIV CODE(S3)
Note: The right most field-name on the break statement is the first level break.
This example causes the fifth level control break to occur when the SHIFT value changes, a third level control break (with a skip to a new page) when the DAY changes, and a second level control break when the WEEKDAY value is SUNDAY. The first level control break occurs for each new DIV CODE, regardless of other break criteria. Three (3) blank lines separate the DIV CODE break line from the next report line.
| Copyright © 2012 CA. All rights reserved. |
|