

Designing Client/Server Applications › How to Add Distributed Process to an Existing Model › Copy the PrAD Logic
Copy the PrAD Logic
Now that you have a DLG for the distributed process application, you need to copy the PrADs from the terminal-based application.
Follow these steps:
- Open the business system for the terminal-based application.
- Select the Action Diagram tool.
- Open a PrAD that you want to copy.
- Open the business system for the distributed process application.
- Select the Action Diagram tool. You now have two windows open for the Action Diagram tool.
- Open the corresponding server PrAD.
- Select all lines of the logic in the terminal-based PrAD. Do not include the views.
- Select the blank line below the views in the distributed process PrAD.
- Select XCOPY from the Edit menu to copy the logic from the terminal-based PrAD to the distributed process PrAD. The views get copied also.
- Repeat steps 3 and 6 through 9 for each PrAD that you need to copy from the terminal-based application to the distributed process application. When finished, close the Action Diagram tool for the terminal-based application.
Copyright © 2013 CA.
All rights reserved.
 
|
|