

Construction Concepts › Prerequisites
Prerequisites
The Construction Client uses certain diagrams in construction processing:
- Data Model Diagram (DMD)
- Technical Design (TD)
- Dialog Flow Diagram (DLG)
- Action Diagram(s) (AD)
- Screens built using the Screen Design (SD) Tool (for a character-based application)
- Windows and Web clients built using the Window Design functionality for:
- GUI application (GUI application with local database)
- GUI client component of the Client/Server application
- Web Client application with local database
- Web Client component of Client/Server application
Other prerequisites must also be met before you can complete the Construction process:
- Model must pass a Consistency Check with no errors and the required diagrams must be complete. (This process is done within the Toolset or the CSE.)
- Upload the model to the encyclopedia.
- You must be the encyclopedia administrator or model owner, or have Update (for packaging) or Generate (for generation) authority for a model.
Copyright © 2013 CA.
All rights reserved.
 
|
|