DevTest can determine that more capacity is required to meet the needs of a running test and then automatically expand the lab.
Use a staging document that has the Dynamic Simulator Scaling with the DCM distribution pattern. For more information, see Distribution Selection.
The following graphic shows an example. In the left portion, the lab initially has one coordinator and one simulator. In the right portion, the lab has one coordinator and four simulators after the expansion happens.
Copyright © 2014 CA Technologies.
All rights reserved.
|
|