Previous Topic: Customization StepsNext Topic: Step 1. Allocates, Loads Databases, and Init Control Data Sets


New Installation Phase

If you are upgrading, do not perform these steps. To continue your installation, see Upgrade Installation Phase.

The following is a comprehensive list of all possible steps for a new installation only. If it is your first time to install CA Datacom, perform these steps after completing the SMP/E jobs described in the following:

For this phase of the installation, run the INSTJCL library members whose names start with BDNEW.

Step

Description

Purpose

1

Retrieve BDNEW01 from INSTJCL, perform changes as directed, and submit the JCL.

Allocates all database areas and null loads all the bases. This process loads and marks as loaded all bases that are delivered by CA Datacom.

This job is fully rerunable.

2

Retrieve BDNEW02 from INSTJCL, perform changes as directed, and submit the JCL.

Manages all the VLS file build processes as needed by the new install process.

This job uses the same process as Step 1 and is fully rerunable.