If you are upgrading, do not perform these steps. To continue your installation, see Upgrade Installation Phase.
The following is a comprehensive list of all possible steps for a new installation only. If it is your first time to install CA Datacom, perform these steps after completing the SMP/E jobs described in the following:
For this phase of the installation, run the INSTJCL library members whose names start with BDNEW.
|
Step |
Description |
Purpose |
|---|---|---|
|
1 |
Retrieve BDNEW01 from INSTJCL, perform changes as directed, and submit the JCL. |
Allocates all database areas and null loads all the bases. This process loads and marks as loaded all bases that are delivered by CA Datacom. This job is fully rerunable. |
|
2 |
Retrieve BDNEW02 from INSTJCL, perform changes as directed, and submit the JCL. |
Manages all the VLS file build processes as needed by the new install process. This job uses the same process as Step 1 and is fully rerunable. |
|
Copyright © 2014 CA.
All rights reserved.
|
|