To perform a full load of the Directory, perform an INIT prior to the load. The INIT function can occur in a separate execution of DBUTLTY immediately preceding the LOAD or in a step preceding the step specifying the LOAD.
CA Datacom/DB restores all backup information during the LOAD with the following changes.
If the 10,000 increment does not ensure that numbers do not repeat, back up the newly loaded Directory, initialize and reload the Directory to increment the run unit number by another 10,000.
Because of this movement, the Directory must not be open for processing. If the Directory is open for processing and CA Datacom/DB attempts to access the Directory, problems such as errors 13(126), 13(04), or 04(47) can occur. These errors do not cause the Multi-User Facility or CICS to abend, but you must close all CICS User Requirements Tables and end all batch jobs.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|