You can schedule a report to run at a specific time.
To schedule a report
The Properties dialog of the report appears.
The Scheduling Properties dialog appears.
The report is scheduled to run at the specified time.
|
Copyright © 2014 CA Technologies.
All rights reserved.
|
|