The following table maps other project field information in Microsoft Project to fields on the scheduling properties page in CA Clarity PPM:
Microsoft Project |
CA Clarity PPM |
Notes |
---|---|---|
Text5 |
Charge Code PRJ_PROJECTS: PRCHARGECODEID |
The charge code ID (PREXTERNALID) is shown in Microsoft Project. To modify the charge code for a project, enter a charge code ID that exists in CA Clarity PPM to save the project back to CA Clarity PPM. This default mapping can be changed. |
Copyright © 2013 CA.
All rights reserved.
|
|