To save an existing project to CA Clarity PPM, requires you to have edit access rights and lock option on the project. You cannot save to CA Clarity PPM when another user has locked the project, or when you did not lock it. If necessary, you can force a save.
Once you save your existing project, you can continue to modify the project, even when it is locked.
Follow these steps:
The project remains open and locked.
If you do not have a lock on the project, a message appears prompting to force a save.
Your changes are saved.
Copyright © 2013 CA.
All rights reserved.
|
|