Metrics can be moved between sections (Contractual, Financial or Operational) in a Service Level Template. The move is made in the specific Service Level Template and does not affect other Service Level Templates, contracts or contract templates created from this Service Level Template.
Metrics are moved from the Service Level Template Details page All Metrics tab. They can be moved individually or multiple metrics at the same time.
Follow these steps:
The Service Level Template Details page All Metrics tab opens.
The Move Metric dialog box opens.
A notification dialog box opens.
The metrics are moved to the desired section.
Note: If metrics of a certain type are not allowed to be moved to a particular section, a notification message opens showing what metrics were moved and what were not.
|
Copyright © 2012 CA.
All rights reserved.
|
|