To remove a schedule from a report
The Report Properties page opens.
The Scheduling dialog box opens.
Note: You may need to scroll down to view the Scheduling option.
The schedule is removed and the Report Properties page is refreshed.
|
Copyright © 2013 CA.
All rights reserved.
|
|