Previous Topic: IPL the Operating System and Initialize CA 1® Tape ManagementNext Topic: Install the ISPF Interface


Run the CA 1® Tape Management Demonstration

This optional procedure tests the CA 1® Tape Management tape functions and batch utilities to verify the proper installation of CA 1® Tape Management.

JCL is provided in the CA 1® Tape Management library hlq.CTAPJCL(TMSIVP) member. Remove any steps not needed for testing and modify the parameters and symbolics for each program based on your requirements.