Previous Topic: Scheduled Versus Immediate Transfer Considerations

Next Topic: Batch Interface


Scheduling a Transfer with GDG(0)

If you schedule a transfer with GDG(0) or GDG(+0) specified, the XCOM server resolves the file name to be the current GxxxxV00 number at the time the transfer is scheduled. If you specify HOLD=YES, such as in an XTC scenario, a relative generation number is used until the specific version is resolved. This occurs just before the data set is opened.