Previous Topic: Workload Planning ReportsNext Topic: Hourly INIT Usage Projection Report WLP02


Card Input Edit Report WLP01

The Card Input Edit report is an audit trail/error report of either the WLP1 or WLP2 control statement used in either a projection or an actual run. The report shows the values of either WLP1 or WLP2, in effect, during the run.

This report is output with reports WLP02 through WLP07 so that you can see the values used in the run, rather than having to refer to the control records for that run.

Following is an example of the WLP1 control statement used in a projection run, including the projection timespan for that run. The values shown in the report correspond to the values entered in the control record for the batch run for the projection.

WLP01 - 01/12/yy.012 09:45:46 PAGE 0001 *** C A - 7 W O R K L O A D P L A N N I N G *** C O N T R O L C A R D S WLP1 TP1=+00 CONTROL VALUES IN EFFECT WLP1 ETF=+000 TP1=+00 TP2=+00 INIT=+00 ALG=WLB SCNSPAN=04 SCNINCR=00 RERUN=NO LPP=60 CPUS=01 TITLE=CA-7 WLP01 - 01/12/yy.012 09:45:46 PAGE 0001 W L P E R R O R M E S S A G E PROJECTION TIME SPAN WAS FROM=yy.011/0900 (20yy.011/09:00) TO=yy.011/2019 (20yy.011/20:19)

This report contains the following fields:

WLP01 - mm/dd/yy.ddd hh:mm:ss

Specifies the date and time-of-day of the projection run that created this report.

CA-7 WORKLOAD PLANNING CONTROL CARDS

Identifies the report.

WLP1

Shows the control statement identifier.

CONTROL VALUES IN EFFECT

Shows the values that were in effect for the WLP1 control statement for this particular projection run.

WLP ERROR MESSAGE

Shows the error messages and any items that were specified incorrectly.

PROJECTION TIME SPAN WAS

Identifies the timespan that is used in this projection.

Following is an example of a WLP01 report that comes from an actuals run. The actuals run uses the WLP2 control statement.

WLP01 - 01/12/yy.012 09:45:46 PAGE 0001 *** C A - 7 W O R K L O A D P L A N N I N G *** C O N T R O L C A R D S WLP2 FROM=yy013/0000,SPAN=24 CONTROL VALUES IN EFFECT WLP2 CPUID=ALL LPP=60 MAXRUN=12 TITLE=CA-7 SPECIFIED TIME SPAN WAS FROM=08013/0000 (20yy.013/00:00) TO=08013/2400 (20yy.013/24:00) LOW DATE=08013/0921 (20yy.013/09:21) HIGH DATE=08013/0533 (20yy.013/05:33)

This report contains the following fields:

WLP01 - mm/dd/yy.ddd hh:mm:ss

Specifies the date and time-of-day of the actuals run when this report was created.

CA-7 WORKLOAD PLANNING CONTROL CARDS

Identifies the report.

WLP2

Shows the values that were entered on the WLP2 control statement in the actuals run. Defaults go into effect when parameters are not specified.

CONTROL VALUES IN EFFECT

Shows the values that were in effect for the WLP2 control statement for this particular actuals run.

SPECIFIED TIME SPAN WAS

Shows how the system interpreted the FROM and TO or FROM and SPAN parameters specified. Additionally, the LOW and HIGH date and time values from the History/Archives input files are listed.