CA7xx026 Schedule Scan Activity

The Schedule Scan Activity report provides a profile of activity by the schedule scan task. The log record type from which this report is produced is TYPE=161.

12/11/yy CA-7 SCHEDULE SCAN ACTIVITY PAGE 1 TIME: 14.25.18 REQUEST - CA7xx026 ----------------------------------------------------------------------------------------------------------------------------------- TASK AVG SECS AWAKE ACTUAL AVG SECS SCAN JOBS CALENDAR TIMES WAKEUPS /WAKEUP PCT SCANS /SCAN PCT SCHEDULED SCHEDULED ----------------------------------------------------------------------------------------------------------------------------------- yy.032/08:00 - 08:30 25 1.95 2.74 1 46.97 2.63 20 12 yy.032/08:30 - 09:00 33 .26 .49 0 .00 .00 22 0 yy.032/09:00 - 09:30 51 .93 2.62 1 42.66 2.36 40 6 yy.032/09:30 - 10:00 28 .12 .19 0 .00 .00 25 0 yy.032/10:00 - 10:30 33 1.90 3.50 1 59.65 3.33 31 8 yy.032/10:30 - 11:00 28 .19 .30 0 .00 .00 30 0 yy.032/11:00 - 11:30 34 1.62 3.08 1 51.26 2.85 21 4 yy.032/11:30 - 12:00 32 .11 .20 0 .00 .00 16 0 END OF REPORT

This report contains the following fields:

TIMES

Identifies the increment of date and time. Each increment spans the number of minutes specified in the SUMM parameter. The FROM parameter sets the first increment start time. The THRU parameter sets the end time of the last increment.

TASK WAKEUPS

Identifies the number of times the task was activated to perform a scheduling function.

AVG SECS/WAKEUP

Identifies the average number of seconds the task was active for an active period.

AWAKE PCT

Identifies the percent of elapsed time, in hundredths of a percent, that the task was active.

ACTUAL SCANS

Identifies the number of times that the database was scanned to see if the calendar scheduled work was due to be scheduled into the queues.

AVG SECS/SCAN

Identifies the average number of seconds that each actual scan consumed.

SCAN PCT

Identifies the percent of elapsed time, in hundredths of a percent, that actual scans were active.

JOBS SCHEDULED

Identifies the total number of jobs that were scheduled into the queues for calendar schedules, demand work, triggers, and so forth.

CALENDAR SCHEDULED

Identifies the number of those jobs that were scheduled into the queues solely based on a calendar schedule.