Previous Topic: CAL2A016E:Next Topic: CAL2A017E:


CAL2A015E:

Action is required (ADD or SUB).

Reason:

An Adjust Schedule request was made without specifying whether to add to or subtract from the due-out times for jobs/networks.

Action:

Specify either ADD (to add time to schedules) or SUB (to subtract times from schedules) when making the request.