Previous Topic: Step 5: Configure the Product for Initial TestingNext Topic: Step 7: Convert Production Data for Use on Test System


Step 6: Start the Product for Initial Testing

Starting Your Product continues with more steps that you take to configure the product.

You start using the product interface to CA Datacom/AD when you execute the N220 job to define the installation verification (IVP) jobs. This process is described in Execute in Batch Mode to Define IVP Jobs (N220).

Starting Your Product discusses starting the address spaces that are required for initial product testing. The following address spaces are required for the activities that are described in Installation Verification Process:

Some enterprises require testing these address spaces also:

This release introduces changes to the startup and shutdown behavior of CA7ONL. These changes are mentioned in Release Notes and are described in greater detail in the Systems Programming Guide.