Previous Topic: Prepare to Start CA 7 r11.3


Start CA7ONL r11.3

Start CA7ONL r11.3 with MOVQ pointing to the UCC7DMPQ and CA7VDMP files that AL2DCR20 created.

Start the ICOM on each system using the r11.3 libraries.

After you are satisfied that the r11.3 environment is correct, use the START,Q=ALL and SSCAN,SCAN=SCH commands to resume CA7ONL processing.

Monitor to ensure that jobs are brought into the system and flow through the active workload queues as expected.

Edit the initialization file to undo the changes you made to the SCHEDULE and INIT statements.