Previous Topic: Forecast FacilityNext Topic: Forecast Commands


Forecast Options

Two options are provided throughout the forecast application. For the first option, workload is projected only from the CA WA CA 7 Edition database. No existing workload is projected from the CA WA CA 7 Edition queues. This option requires a beginning time and is used for nonspecific long range requests.

The second option takes the workload existing in both the database, the CA WA CA 7 Edition queues, or both into account in the forecast. This option uses the current time as the beginning of the time interval so that current and future workload can be forecasted. This option is typically used for shorter and more specific requests.