With this release, several components are included when the installation occurs. Previously, on the CA 7 r11.1 tape, CA 7 and CA General Transaction Server (CA GTS) were included together, while CA Critical Path Monitor (CA CPM) was located on file 5 of the tape. CA CPS, required for CA WCC and Jobflow Illustrator, was delivered on a separate tape. This method required several installations to install all of the components together.
CA CPS has been moved into the CA Workload Automation SE SMP/E function (FMID). CA CPS is required for CA WCC and for the CA Workload Automation SE feature Jobflow Illustrator Online. Because only CA Workload Automation SE uses CA CPS, placing all elements into the CA Workload Automation SE function reduces the number of STEPLIB data sets needed for the CPS and SCHSRVR tasks.
With CA Workload Automation SE r11.3, you can install a total of five SMP/E functions together:
We recommend that you install all components in the package during the installation, because these are all new releases. If necessary, a site can comment out any unnecessary functions.
Note: For more information, see the Installation Guide.
|
Copyright © 2013 CA Technologies.
All rights reserved.
|
|