Reason:
At least one day scheduled by this ID is also scheduled by one or more other IDs within the schedule definition. Also, this message can be caused by the ROLL option forcing one day's schedule to be rolled forward or backward matching another day's schedule within the same ID. If DUPDATE=YES is specified on the RESOLV command, message SRC1-137 will also be produced indicating the duplicate days.
Note: This is a warning only; the schedule member involved is updated unless other critical errors are detected.
Action:
Verify that multiple processing of the job (or workstation activity) in one day will produce the results you want. If not, the schedule member should be changed and resolved again. It is possible, due to the way different calendars can be built, that the multiply scheduled day is not within the forecastable time frame. Also, having calendars for the previous year and the next year can sometimes alleviate this message. If this does not, check to see if the job is scheduled more than once for the same day. To do this, issue command FJOB,JOB=jobname,SPAN=8742 through the Batch Terminal Interface and check the output. If the job does not forecast twice for the same day, this situation may clear itself up with the next time frame's RESOLV.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|