Previous Topic: SRC1-114Next Topic: SRC1-116


SRC1-115

mmmdd (DAY # nnn) FALLS ON A NON-SCHEDULE DAY, SCHEDULE DAY OMITTED

Reason:

The schedule day indicated by month (mmm) and day (dd, nnn) has fallen on a base calendar nonschedule (nonprocessing) day. The ROLL option defined in the database schedule entry specified that scheduling should be omitted on base calendar nonprocessing days.

Action:

Verify each of these days to ensure that bypassing normal scheduling produces the results you want.