Reason:
The schedule day indicated by month (mmm) and day (dd, nnn) has fallen on a base calendar nonschedule (nonprocessing) day. The ROLL option defined in the database schedule entry specified that scheduling should be omitted on base calendar nonprocessing days.
Action:
Verify each of these days to ensure that bypassing normal scheduling produces the results you want.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|