Previous Topic: SM85-00Next Topic: SM85-01


SM85-00

cccccccc ffffffff SUCCESSFUL [RESOLVE MAY BE REQUIRED]

Reason:

The requested function (ffffffff) for calendar cccccccc completed successfully. Because the function affected a standard CA Workload Automation SE base calendar, a RESOLVE command is sometimes required to update schedules that use this calendar.

Note: If you add a leap year calendar and do not change the end of February to be 29, you receive the following additional message alerting you of a possible problem:

NOTE: END OF FEB IS NOT 29

Verify that you have the correct month end date for February.

If you refresh a calendar, you receive one of these additional messages indicating the refresh source:

NOTE: REFRESHED FROM LOADLIB
NOTE: REFRESHED FROM PCALYYxx 

Action:

RESOLVE any affected schedules if needed.