Previous Topic: SLIR-50Next Topic: SLIR-52


SLIR-51

xxxxxxxx START DATE OR DURATION IS REQUIRED.

Reason:

Keyword xxxxxxxx has a valid format, however, the first operand is omitted (start date, or, duration). This parameter is required.

Action:

Specify either the start date, or a duration as the first parameter of the SPAN= or OUTAGE= keyword and resubmit the command.