The FQALL command provides forecasting for both jobs and workstation networks. It includes work in the request, ready, active, preprocess, and postprocess queues.
This command has the following format:
►►─ FQALL ─┬────────────────────────────┬─┬──────────────────────┬────────────► └─ , ─┬─ TO=(mmddyy,hhmm) ─┬─┘ └─ ,DRMODE= ─┬─ YES ─┬─┘ └─ SPAN=hhhh ────────┘ └─ NO ──┘ ►─┬────────────────────────────────┬─────────────────────────────────────────► └─ ,DRCLASS=(class1,...,class8) ─┘ ►─┬───────────────────────────────────────┬─┬───────────────────────┬────────► └─ ,JOB= ─┬─ * ◄ ─────────────────────┬─┘ └─ ,JOBNET= ─┬─ * ◄ ──┬─┘ ├─ jobname ─────────────────┤ ├─ name ─┤ ├─ (jobname1,...jobname10) ─┤ └─ mask ─┘ └─ mask ────────────────────┘ ►─┬──────────────────────┬─┬─────────────────────┬─┬───────────────┬─────────► └─ ,LIST= ─┬─ ALL ◄ ─┬─┘ └─ ,LVL= ─┬─ 100 ◄ ─┬─┘ └─ ,MAINID=SYn ─┘ ├─ #JOB ──┤ └─ nnn ───┘ ├─ CPU ───┤ ├─ GRPH ──┤ ├─ JOB ───┤ ├─ STN ───┤ └─ TAPE ──┘ ►─┬───────────────────────┬─┬──────────────┬─┬──────────────────────┬────────► └─ ,NW= ─┬─ * ◄ ──────┬─┘ └─ ,RINT=hhmm ─┘ └─ ,SEQ= ─┬─ DLDT ◄ ─┬─┘ ├─ network ──┤ ├─ DODT ───┤ └─ network* ─┘ └─ JOB ────┘ ►─┬───────────────────────────────────────┬─┬──────────────────────┬─────────► └─ ,STN= ─┬─ * ◄ ─────────────────────┬─┘ └─ ,SYS= ─┬─ * ◄ ────┬─┘ ├─ station ─────────────────┤ ├─ system ─┤ ├─ station* ────────────────┤ └─ mask ───┘ └─ (station1,...station10) ─┘ ►─┬───────────────────────┬─┬─────────────────────────┬──────────────────────►◄ └─ ,TRIG= ─┬─ J ◄ ────┬─┘ └─ ,TYPE= ─┬─ ACTUAL ◄ ─┬─┘ ├─ D ──────┤ └─ ALL ──────┘ ├─┬─ JD ─┬─┤ │ └─ DJ ─┘ │ └─ N ──────┘
Defines the ending date and time for the time interval to be forecast. If TO is specified, SPAN must be omitted. If neither is specified, only work in the queues is considered.
Defines the length of the time interval to be forecast. This value is added to the current date and time-of-day to determine the ending date and time of the forecast time interval.
Limits: 1 to 4 numeric characters specified as hhhh where the minimum value is 1 hour and maximum value is 8784 hours
Required: Yes, unless TO is used
(Optional) Specifies the options for resource forecasting. If you code the LIST option, you must also specify the RINT option.
Produces all of the following choices. With this option, TAPE1 displays separately from TAPE2. ALL is the default.
Graphically displays number of jobs running during each time interval specified.
Graphically displays percent of CPU usage during each time interval specified.
Graphically displays number of jobs running, percent of CPU used and tape usage during each time interval specified.
Produces resource forecast report for CPU workload.
Produces resource forecast report for workstation workload.
Graphically displays the number of tapes (both TAPE1 and TAPE2) forecasted for each time interval specified.
Copyright © 2013 CA Technologies.
All rights reserved.
|
|