The FQJOB command provides forecasting by job name including those jobs in the request, ready, and active queues.
This command has the following format:
►►─ FQJOB ─┬────────────────────────────┬─┬──────────────────────┬────────────► └─ , ─┬─ TO=(mmddyy,hhmm) ─┬─┘ └─ ,DRMODE= ─┬─ YES ─┬─┘ └─ SPAN=hhhh ────────┘ └─ NO ──┘ ►─┬────────────────────────────────┬─────────────────────────────────────────► └─ ,DRCLASS=(class1,...,class8) ─┘ ►─┬───────────────────────────────────────┬─┬───────────────────────┬────────► └─ ,JOB= ─┬─ * ◄ ─────────────────────┬─┘ └─ ,JOBNET= ─┬─ * ◄ ──┬─┘ ├─ jobname ─────────────────┤ ├─ name ─┤ ├─ (jobname1,...jobname10) ─┤ └─ mask ─┘ └─ mask ────────────────────┘ ►─┬──────────────────────┬─┬─────────────────────┬─┬───────────────┬─────────► └─ ,LIST= ─┬─ ALL ◄ ─┬─┘ └─ ,LVL= ─┬─ 100 ◄ ─┬─┘ └─ ,MAINID=SYn ─┘ ├─ #JOB ──┤ └─ nnn ───┘ ├─ CPU ───┤ ├─ GRPH ──┤ ├─ JOB ───┤ ├─ TAPE ──┤ ├─ W ─────┤ ├─ WP ────┤ ├─ WPS ───┤ └─ WS ────┘ ►─┬───────────────────┬─┬──────────────┬─────────────────────────────────────► └─ ,NWOPT= ─┬─ N ─┬─┘ └─ ,RINT=hhmm ─┘ └─ S ─┘ ►─┬─────────────────────────────┬─┬──────────────────────┬───────────────────► └─ ,SEG=(segment,subsegment) ─┘ └─ ,SEQ= ─┬─ DLDT ◄ ─┬─┘ ├─ DODT ───┤ └─ JOB ────┘ ►─┬──────────────────────┬─┬───────────────────────┬─────────────────────────► └─ ,SYS= ─┬─ * ◄ ────┬─┘ └─ ,TRIG= ─┬─ J ◄ ────┬─┘ ├─ system ─┤ ├─ D ──────┤ └─ mask ───┘ ├─┬─ JD ─┬─┤ │ └─ DJ ─┘ │ └─ N ──────┘ ►─┬─────────────────────────┬────────────────────────────────────────────────►◄ └─ ,TYPE= ─┬─ ACTUAL ◄ ─┬─┘ └─ ALL ──────┘
Defines the ending date and time for the time interval to be forecast. If TO is specified, SPAN must be omitted. If neither is specified, selection is based on only those jobs in the queues.
Defines the length of the time interval to be forecast. This value is added to the current date and time-of-day to determine the ending date and time of the forecast time interval.
Limits: 1 to 4 numeric characters specified as hhhh where the minimum value is 1 hour and maximum value is 8784 hours
Required: Yes, unless TO is used
Specifies the options for resource forecasting. If you code the LIST option, you must also specify the RINT option.
Produces all of the following choices. With this option, TAPE1 displays separately from TAPE2. ALL is the default.
Graphically displays number of jobs running during each time interval specified.
Graphically displays percent of CPU usage during each time interval specified.
Graphically displays number of jobs running, percent of CPU used and tape usage during each time interval specified.
Produces resource forecast report for CPU workload.
Graphically displays the number of tapes (both TAPE1 and TAPE2) forecasted for each time interval specified.
For worksheet requests, RINT must be omitted and LIST can have one of the following values:
Produces a schedule worksheet, without prose from the forecast report.
Produces prose information with the specified forecast worksheet.
Produces the same information as WP except skips to the top of the page for each job.
Produces the same information as W except skips to the top of the page for each job.