The worksheet options from forecast provide conveniently formatted checklists for projected CPU job activities. When requested, production control personnel can use the output for status, planning, or even recovery documentation.
Worksheets for jobs are requested using the LIST option of the FJOB or FALL command. This option is most useful when requested through the Batch Terminal Interface facility because the output is in hardcopy format and can be filed or distributed as desired.
For a sample worksheet, see the LIST option of the FJOB command.
JOB Worksheet, LIST=W
FJOB,FROM=0306yy,TO=0306yy,LIST=W DATE 02-27-yy PAGE 0002 JOB=DUCCXX01 COMPLETED ________________ SCHEDULE: LATEST STRT=yy065/0759 SCHD MBR=SJ000001 DUEOUT TIME=yy065/0800 SCHED ID=001 SUBMIT TIME=yy065/0000 GENERAL: JCLMBR=DUCCXX01 JCLID=000 SYSTEM=TESTNTWK LTERM= NBRRUN=007 LSTRUN=yy261/1607 RESOURCE: MAINID=ALL PRTY=000 CLASS=A ELAPTM=0001 TP1 =00 TP2 =00 EXECUTION: RELOAD=NO EXEC=YES MAINT=NO RETJCL=NO HOLD=NO
JOB Worksheet, LIST=WP
FJOB,FROM=0306yy,TO=0306yy,LIST=WP DATE 02-27-yy PAGE 0002 JOB=DUCCXX01 COMPLETED _______________ SCHEDULE: LATEST STRT=yy065/0759 SCHD MBR=SJ000001 DUEOUT TIME=yy065/0800 SCHED ID=001 SUBMIT TIME=yy065/0000 GENERAL: JCLMBR=DUCCXX01 JCLID=000 SYSTEM=TESTNTWK LTERM= NBRRUN=007 LSTRUN=yy261/1607 RESOURCE: MAINID=ALL PRTY=000 CLASS=A ELAPTM=0001 TP1 =00 TP2 =00 EXECUTION: RELOAD=NO EXEC=YES MAINT=NO RETJCL=NO HOLD=NO ******** JOB EXECUTION REQUIREMENTS ******* ________ EXTERNAL USR=THIS IS THE FIRST JOB IN THE TEST ________ EXTERNAL USR=SYSTEM, IF YOU WISH TO BEGIN YOU ________ EXTERNAL USR=SATISFY THESE REQUIREMENTS! ******** JOB PROSE DESC=THIS IS JOB INFORMATION FOR DUCCXX01 ****** THIS IS THE FIRST JOB IN THE TESTNTWK TO BE EXECUTED AND IS A SCHEDULED JOB. IT CONSISTS OF TWO STEPS. THE FIRST STEP RECEIVES A SET OF CONTROL CARDS AS INPUT, CREATES A DATASET U7TEST01 AS OUTPUT AND DEMANDS THE NEXT JOB DUCCXX02 TO BE STARTED AFTER THE SUCCESSFUL COMPLETION OF THE STEP. THE SECOND STEP RECEIVES ANOTHER SET OF CONTROL CARDS AS INPUT AND CREATES A DATASET U7TEST02 AS OUTPUT. IN TURN, U7TEST02 AUTO-TRIGGERS JOB DUCCXX03. #QDESC *** JOB DUCCXX01 *** SCHEDULED JOB, FIRST IN THE NETWORK *** FIRST STEP *** INPUT-CONTROL CARDS OUTPUT-U7TEST01 *** SECOND STEP *** INPUT-CONTROL CARDS OUTPUT-U7TEST02 #END,QDESC
Copyright © 2013 CA Technologies.
All rights reserved.
|
|