The START top line command resumes normal job flow in the request and ready queues after a previous STOP command was issued to halt job flow. A START command is required to reestablish normal queue activity following a STOP command.
This command has the following format:
►►─ START ─ ,Q= ─┬─ ALL ─┬────────────────────────────────────────────────────►◄ ├─ RDY ─┤ └─ REQ ─┘
Identifies the queues to restart after a previous STOP command was issued.
Causes both the request and ready queues to be restarted.
Causes the ready queue to be restarted.
Causes the request queue to be restarted.
Copyright © 2013 CA Technologies.
All rights reserved.
|
|