The PRSQA command activates a corequisite resource. When a job is connected to a corequisite resource and the resource usage type is active, the corequisite resource must be activated using the PRSQA command.
This command has the following format:
►►─ PRSQA ─ ,RSRC=resource ─ ─┬──────────────────────────┬───────────────────►◄ └─ ,INTERNAL= ─┬─ NO ◄ ─┬─┘ └─ YES ───┘
Specifies a fully qualified corequisite resource name.
Limits: 1 to 44 characters
(Optional) If YES or Y is specified, the command is not forwarded to other CA 7 instances even if VRM Corequisite Propagation is enabled and the resource name matches the selection criteria.
Default: NO
Copyright © 2013 CA Technologies.
All rights reserved.
|
|