Previous Topic: CPM1601INext Topic: CPM1603I


CPM1602I

('flow') 'act' 'stat' 'eta' 'jct' 'cct' 'sla' 'pct'

Reason:

This message is the body of flow status notifications sent to an MVS console or to the CPM log as the result of a previous LISTEN command.

flow

Indicates the name of the flow.

act

Indicates the action that triggered the notification.

stat

Indicates the current or new status for the flow. The following statuses are valid:

Unknown

Indicates no status available.

Loaded

Indicates the loading of the basic flow information. CA CPM is calculating the critical path.

No_paths

Indicates that CA CPM cannot find any string of jobs connecting the first job to the last job.

Not_started

Indicates that CA CPM has successfully loaded the flow and determined the critical path. The first job in the flow has not yet started.

Job_abended

Indicates that one or more jobs in the flow abended or ended with a bad return code (as defined to the job management product).

On_time

Indicates that CA CPM estimates that the flow can complete by the SLA.

Almost_late

Indicates the CA CPM estimates that the flow can complete by the SLA, but only by a narrow margin. The installation option FlowWarnPercent controls how narrow the margin is.

Late

Indicates that CA CPM estimates that the flow completes after the SLA.

Complete

Indicates that the flow is complete on time.

No_firstjob

Indicates that the job management product informed CA CPM about a flow but did not provide the starting job of the flow. The job management product is responsible for passing more information to CA CPM.

No_lastjob

Indicates that the job management product informed CA CPM about a flow but did not provide the ending job of the flow. The job management product is responsible for passing more information to CA CPM.

Overdue

Indicates that the flow is not complete by the SLA, which has now passed.

Complete_late

Indicates that the flow is complete, but after the SLA is passed.

Loading

Indicates that CA CPM is asking the job management product for the flow information.

Load_failed

Indicates that CA CPM was unable to collect flow information from the job management product. This failure can result from a CA CPM HOLD command, the job management product being unavailable, or a problem in the job management product.

Missed_start

Indicates that the starting job was not submitted before its deadline time. This status is used only for CA Workload Automation SE flows.

eta

Indicates the current estimated completion time for the flow.

jct

Indicates the number of jobs in the flow.

cct

Indicates the number of completed jobs in the flow.

sla

Indicates the required completion time.

pct

Indicates the percentage flow complete.

Action:

None.