Use options 2 or 4 from the sort order display to set a custom sort order. Option 2 sets a custom sort order for flows, while option 4 sets a custom sort order for jobs. The screens work identically. The following is the screen for flow status:
--------------- CA-CRITICAL PATH MONITOR FLOW STATUS SORT ORDER -- Row 1 of 16 COMMAND ===> SCROLL ===> PAGE Use Move and Before/After commands to move the status to the desired order. Status --------------- _ Load Failed _ Overdue _ Late _ Almost Late _ Unknown _ Job Has Abended _ No Path _ Not Yet Started _ No Start Job _ No End Job _ On Time _ Loaded _ Complete-Late _ Complete _ Deleted _ Loading ******************************* Bottom of data *************************
You can move a status before or after another status by typing an M (for Move) to the left of the status to move. Type an A or B (for After or Before) to indicate where to move the status, and then press Enter. The row is moved to the new location.
Enter the RESET command on the command line to reset the list to the default order.
Enter the CANCEL or CAN command on the command line to exit the list without making any changes.
|
Copyright © 2013 CA Technologies.
All rights reserved.
|
|