CA Scheduler r11 does not need any DD statements in the CPMSRVR task. The CA Scheduler CAILOAD and Advantage CA Datacom/AD CUSLIB/CAILOAD are required in the STEPLIB concatenation or in the linklist.
Note: For more information about the CA Scheduler interface with CPM, see the CA Scheduler Interfaces Guide.
|
Copyright © 2013 CA Technologies.
All rights reserved.
|
|